Uluabat Hydro

Turkey

Background image

About the project.

Uluabat HEPP and Cinarcik Dam Project is an integrated project located on the lower basin of Orhaneli Creek, one of the major branches of Mustafa Kemalpasa River. It is built within the scope of Emet Orhaneli Project for utilizing the water potential in Marmara Region. Uluabat HEPP project has installed capacity of 100 MW and expected to generate 422.6 GWh as per the license however due to the use of water for other purposes, it is expected to decrease to 373.03 GWh in 2021 and 323.653 GWh in 2028 in parallel to GWh. For the first crediting period, it has been assumed that average generation will be 422.6GWh. Electricity generated by the power plant is delivered to the grid by an 11.2 km long 154 kV double circuit overhead transmission line.